Our project references
















Complete list of projects
- Monitoring of bridge structure deflections — S-profess
- Dynamic measurement during a static daily load test — MDS Projekt / VCE Vienna Consulting Engineers
- Monitoring of the I/34 Lišov–Vranín bridge structure using strain gauge sensors — M-Silnice a.s.
- Testing of dynamic and static monitoring — Tüv Süd Rail
- Monitoring of the Riselva railway bridge on the BaneNor line, Norway — BMO ENTREPRENØR
- D35 Opatovec – monitoring during incremental launching of the bridge structure — Pontex, spol. s r.o.
- Wooden bridge in Třebíč (Poušov) — Elite Timber Construction, s.r.o.
- Pavel Wonka Bridge, Pardubice, dynamic monitoring during reconstruction — MDS Projekt
- Pilot project for monitoring a steel bridge in Vysoká nad Labem — Správa silnic Královehradeckého kraje
- Říkonín Viaduct – monitoring of the bridge structure — Mostní a silniční, s.r.o.
- Monitoring of the Šmejkalka bridge structure (D1 motorway) — Strabag a.s.
- Monitoring of the corrosive environment on a bridge structure, Ostrava Svinov — Techtest s.r.o.
- Load test and long-term monitoring (dynamic) — Technical University of Dresden
- Railway bridge over the Svratka River in Brno — Správa železnic
- Road bridges, pedestrian footbridges (8 structures in total) and a retaining wall — Technická správa komunikací Praha
- Road bridge in Brniště — Krajská správa komunikací Libereckého kraje
- Výtoň Bridge in Praha (railway) — Fakulta stavební ČVUT v Praze
- Bridge over the Elbe, Kladruby – Řečany — MDS projekt s.r.o.
- Road bridges in Vratislavice nad Nisou — Městský obvod Vratislavice n. N.
- Railway steel bridge in Vilémov — Fakulta stavební ČVUT v Praze / Metrostav
- Pedestrian footbridge — Město Železný Brod
- Double-track railway viaduct at Sudovo near Benešov — Fakulta stavební ČVUT v Praze
- Forest lodge – comprehensive structural monitoring — Fakulta lesnická a dřevařská České zemědělské univerzity v Praze
- Monitoring of beams at the Horácká Aréna multifunctional arena in Jihlava — Nordec s.r.o.
- Temperature measurement under a green façade — VŠB – Technická univerzita Ostrava
- Monitoring of building stability, noise levels and traffic impact — Město Chrastava
- Industrial hall in Šluknov — Rada Bulding s.r.o.
- Monitoring of the stability and integrity of a flue-gas desulfurization unit building — Elektrárna Dětmarovice / S-Profess a.s.
- Historic town hall building in Česká Lípa — Město Česká Lípa
- Basilica of the Assumption of the Virgin Mary — UTAM v Praze
- Modřany water structure – vibration analysis — Povodí Vltavy
- Monitoring of high-pressure gas pipeline integrity — Preditest s.r.o.
- Retaining wall during bus station construction works — Město Semily
- Novořecké splavy water structure — Povodí Vltavy
- Černý Vůl II/240, retaining wall — Krajská správa a údržba silnic středočeského kraje
- Retaining wall in Roztoky u Prahy — Krajská správa a údržba silnic středočeského kraje
- Basin of a public swimming pool in Liberec — Bazén Liberec s.r.o.
- Cemetery wall in Semily — Město Semily
- Pipeline bridge — Strength s.r.o.
- Gas pipeline across the Morava River — Preditest s.r.o.
- Horizontal inclinometry – settlement, D0 – Prague Ring Road — Geostar
- Monitoring of the potentially landslide-prone Šporka area — Správa železnic
- Groundwater level monitoring in a borehole, Chomutov — Geotechnika Ďurove
- Monitoring of former mining and potentially slip-prone areas — Ústav geoniky Akademie věd ČR
- Online monitoring as part of the Rock Mass Stability Enhancement project — Strix Chomutov a.s.
- Online monitoring of the Kleiner Anger rock site, Elterlein — Obec Eltertein/Zwönitz (Německo)
- Online monitoring of a potentially landslide-prone area on the D48 construction site — Ředitelství silnic a dálnic
- Monitoring of the Zámky rock formation during remediation — Strix Chomutov a.s.
- ČSM Mines – monitoring of skip tower movement — Ústav Geoniky Akademie věd České Republiky
- Monitoring of glacier retreat in Svalbard — ÚSMH, Akademie Věd ČR
- Monitoring of rockfall in the area of the Pančava Waterfall — ÚSMH, Akademie Věd ČR
- Monitoring of humidity and temperature for composting facilities — Kobra Údlice s.r.o.
Interested in monitoring?
Get in touch — we'll design a solution tailored to your structure.
Book a meeting