Pipe bridges in slovakia

Potrubní most na Slovensku

To increase safety, preventive monitoring of the steel supporting structure and the central pylon was designed on the pipeline bridge over the railway line and the waterway, with a focus on monitoring its possible inclinations depending on the surrounding conditions. 

Our solution

A temperature and tilt sensor I21 was mounted on the central steel pylon, which works as a swing stand. The other two sensors were mounted on the main steel beams

Advantages of the solution

  •  Easy assembly and disassembly –⁠ magnets.
  •  Low operating costs.
  •  Online data in graphs.
  •  Quick evaluation.

Customer: STEFE SK Banská Bystrica; Realization: 10/2021